OUR EXPERIENCE

ISTHA E0-6 Building M-6 Maintenance Facility

image1

Construction of a pre-engineered building for the Illinois Tollway including Mechanical, electrical, and plumbing work.  This work required design by the contractor for the Pre-Engineered Building System and the Footings and Foundations. 

Repair Electrical & Comm Lines Pōhakuloa Training Area

image2

Install drainage improvements for PTA, involves construction of 6 permeable paver fire lanes with adjacent trench drains or gabion mattress swales.  Convert existing secondary electrical system from overhead to underground distribution and extending the existing exterior, underground telecommunications distribution infrastructure

from Building P-238C to buildings in the PTA Cantonment area.

Upgrade Controls Metropolitan Correctional Center Chicago

image3

The intent of the project was to provide the MCC Chicago facility with a renovated

and improved, integrated Security System. This  replaced the existing analog push button

system that controls the doors, intercoms and camera function that integrates with the

intercoms.

O'Hare H&R Plant Fire Protection System

image4

The Fire Protection System at the H&R Plant project required the installation of a wet sprinkler system in the H&R Plant including the high density and higher temperature heads above the generators, containment and demand area extension where ther are ignitable liquids. The structural work required the support of the new piping from the existing structure. The electrical work required interlock for automatic shutdown of fuel on dedicated water flow zones and interlock of flow switches to the fire alarm panel.

Illinois Tollway Administration Building Maintenance

image5

HVAC enhancement to the building and roof top units, building VAV balancing, elevator upgrades and modifications, loading dock enhancements, business center curtain wall and automatic door installation, repairs to building skylights, and electrical upgrades. The work under this Contract was performed at the Tollway Central Administration Building located at 2700 Ogden Avenue, Downers Grove, IL

Jesse Brown VAMC- Chicago, Illinois

image6

Removal of the existing electrical service in Building 5 and a new electrical service provided.

METRA Hyde Park Station- Chicago, Illinois

image7

  • Furnishing and installing CCTV cabling and terminations; 
  • Installation aiming and acceptance of Cameras; 
  • Furnishing and installing fiber optic backbone. 


A very fast track project with 9 separate Metra Stations and 330 cameras. Completed ahead of the 90 day schedule, with a very satisfied client.  As the stations and trains were operational a strict schedule and safety plan were imperative.

Countywide Emergency Power Systems Upgrades- DOC

image8

This project is to provide all work associated with the removal of existing emergency standby generators and associated auxiliary systems and installation of new emergency standby generators and associated auxiliary systems

Cook County Sheriff Video Cameras

image9

Installed High Tech Closed Circuit Video Surveillance Systems at Cook County Illinois facilities, which included Skokie Illinois Court House; Maywood Illinois Courthouse; Bridgeview Illinois Courthouse; Rolling Meadows Illinois Courthouse; Chicago Criminal Courts; and various divisions of the Cook County Jail.  Cook County Jail is the Nation’s largest single site jail.  It houses about 10,000 prisoners and employs 3,900 law enforcement officials and 7,000 civilian employees.

HVAC Units at Hines Building 37 VA Service Distribution Center

image10

 Pagoda prepared site for building operations, including demolition and removal of existing structures, and furnished labor and materials and performed work for replacing/upgrading HVAC units, phase 1 including mechanical, plumbing, electrical, fire protection, structural and architectural work as required by drawings and specifications.